Home     Xml Feed    Submit Articles     Editor Login Contact us
  RSS Feeds   Add us to favorites
  Make us your home page
CATEGORIES
Advice
Alternative Energy
Anger Management
Apple Iphone
Arts & Entertianment
Attorney Info
Automotive
Autoresponders
Blogging
Business - General
Careers & Jobs
CD Duplication
Celebrity Gossip
Child Care
Cigars
Computer Security & Online Safety
Computers & Internet
Credit Repair
Criminology
Dating & Personals
Diamonds/Jewelry
Diet
Ebay
Economy
Education News
Email Marketing
Entertainment News
Exercise
Ezine Marketing
Finance & Investment
Fishing
Food & Drink
Gardening & Landscaping
Google Adsense
Headline News
Health & Fitness
Home & Family
Home Improvement
Hunting
Infants
Insurance
Internet Marketing
Investments
Ipod Video
Legal
Money
Mortgages
MySpace
Online Business
Other
Outdoor Equipment
Personal Health
Pets & Animals
Podcasting
Politics & Government
Radio
Real Estate
Reference & Education
Relationships
Tantra
Religion & Faith
Remote Control
Retirement Planning
Scams
Self Improvement/motivation
Sitemaps
Social
Sports & Recreation
Sunglasses
Teeth
Top News
Travel & Leisure
Vacations
Various
Video Cameras
Video Games
Video Streaming
Viral Marketing
Web Design
Writing & Speaking
Youtube


Drag Line Excavator
 Author: Jeremy Jones
 Website:
 Added: Sun, 05 Aug 2007 19:16:01 -0500
 Category: Outdoor Equipment

Printable version | Email | Bookmark



Drag line excavator systems are heavy machinery that
is used in civil engineering, surface mining, and
excavation. With civil engineering, the smaller
types are used for road and port construction. The
larger types of drag line excavators are used in
strip mining operations to extract coal. These are
among the largest types of mobile equipment and
weigh upwards of 10,000 tons!

The drag line excavator bucket system consists of
a large bucket that is suspended from a boom. The
bucket is moved by a number of chains and ropes. The
hoisting rope, which is powered by either a large
diesel or electric motor, will support the bucket
and hoist coupler assembly from the boom. The
drag rope on the assembly is used to draw the bucket
assembly horizontally. Through skillful maneuvering
of the hoist and drag rope, the bucket can be
controlled for many different types of operations.

Operation
With a typical excavation cycle, the bucket is
positioned high above the material that is being
excavated. The bucket is then lowered down and the
drag rope is drawn so that the bucket is dragged
along the materials surface. Using the hoist rope,
the bucket is then lifted. A swing operation is
then performed in order to move the bucket to the
place where the material is going to be dropped.
The drag rope is then released which will cause the
bucket to tilt, making the material in the bucket
fall down, which is commonly known as a dump operation.

With smaller drag line excavators, the bucket is
thrown by winding up the jib then releasing a
clutch on the drag cable, which swings the bucket
like a pendulum. Skillful operators can make the
bucket land about 1/2 the length of the jib further
away than if it had just been spun or dropped.

Limitations
The limitations of drag line excavators are the
height and length of their boom, as this limits
where the drag line can dump waste material. Being
inherent with their construction, the drag line
is most effective when excavating material
below the level of their tracks. Drag lines
aren't suitable for loading piled up material.

Despite their limitations and high capital cost,
drag line excavators remain very popular with
several mines, due to their very low waste removal
cost, performance, and reliability.

They also have different cutting sequences. The
first is the side casting method which uses
offest benches. This method involves throwing
the overburden sideways onto blasted material to
make a bench.

The second method is a key pass. This pass will
cut a key at the toe of the new highwall and will
also shift the bench further towards the low
wall. This can also require a chopping pass if the
wall is blocky. A chopping pass will involve
the bucket being dropped down onto an angled
highwall to scale the surface.

The next method is the slowest, known as the
blocks pass. This method will however, move the
most material. The blocks pass involves using
the key to access the bottom of the material to
lift it up to spoil or to an elevated bench
level. If required, the final cut is a pull
back, which pulls the material back further to
the low wall side.

For construction, mining, or excavation, drag line
excavators are great to have. They can move even
the biggest of material, which is great for deep
holes in the ground. If you've been looking for a
great way to maximize mining or excavation productivity,
the drag line excavator is just what you need.

PPPPP

(word count 594)

RSS to JavaScript

View all Jeremy Jones's articles


About the Author:

More Outdoor Equipment articles

   ARTICLE SEARCH
  
Search our article database!






:- Recent Articles
iPod iPhone 3GS Firmware Download

:- Top Resources

-->
<

Copyright 2010 Articlesofinfo.com. All Rights Reserved.


Powered by: Content Management